BS 6349-6 PDF

BS 6349-6 PDF

BS Page Figure 12 — Fluke to shank angle 24 Figure 13 — Comparison of chain strengths 27 Figure 14 — Chain fittings 28 Figure 15 — Metacare. Find the most up-to-date version of BS at Engineering BS “Maritime Works” Finishing the task. On. Monday 10th February hrs until hrs. Registration from hrs—at the Council Room.

Author: Mazugar Kajigal
Country: El Salvador
Language: English (Spanish)
Genre: Literature
Published (Last): 20 December 2018
Pages: 23
PDF File Size: 2.34 Mb
ePub File Size: 7.87 Mb
ISBN: 467-2-67963-439-2
Downloads: 11452
Price: Free* [*Free Regsitration Required]
Uploader: Mezisida

A guide to the trailing suction hopper dredger, bed-leveller, grab selection of plant for particular types of dredger, occasionally the bucket dredger and the maintenance dredging activity is provided in stationary suction dredger see section 4 and section 5 and Table Other testing The in situ compactness may be determined by using one of It should be noted that, especially in relation to environmental several tests including the standard penetration test SPT.

Fresh No visible sign of weathering of the The total core recovery is expressed as the length of the total amount rock material of core recovered as a percentage of the length of core run. Also silts denote a grain size, not a consistency.

Due to the finer cost, the need for a more controlled feed into the face control of movement into the face that is necessary and hence for a spud carriage arrangement and with a wheel cutter, bucket wheel dredgers should susceptibility to blockage.

BS 6349-6:1989

These sources are attached to, or simultaneously. Design of dry docks, locks, slipways and shipbuilding berths, shiplifts and dock and lock gates; — Part Further problems may arise if the dredging consideration at the planning stage.

The composition of laboratory in extent, the percentage by mass of the several soil samples can also improve the estimation of the boulder content.

This thickness to a minimum. Be main advantages of the method are the speed of data recovery and the real-time presentation of data as a section. For large dredgers discharge may be up to 90 m from the hull The dustpan dredger is particularly useful where centreline.

The method of disposal of material arising from Sea bed levels within the disposal site should dredging is one of the most important provide for an adequate under keel clearance for the considerations at the design stage of any dredging disposal vessel at all tidal and sea states during work [23].

Not only is b number of difficulties. In all cases, details of all relevant circumstances should be provided, including quantitative and qualitative information on the spoil and where appropriate a description of b dredger previously used.

  MANUAL DE INTERPRETACION MACHOVER PDF

Discharge from hoppers may cause problems.

Such a system is also an important aid to the efficient deployment of trailing suction hopper dredgers see 4. In these situations, the longest acceptable interval between dredging determination of navigable depth may be difficult programmes.

It has been assumed in the drafting of this British Standard that the execution of its provisions is entrusted to appropriately qualified and experienced people. Land reclamation and beach replenishment 8. For convenience, an indication of the limitations applying to all types of conditions which are caused by high wind speeds, dredging plant is given in Table 10 to provide the although operational problems may also arise.

This standard has been updated see copyright date and may have had amendments incorporated. Information on weathering is extremely important from a For dredging assessment, the strength range within the descriptive dredging point of view, and it is suggested that a descriptive term is rather large and therefore it is very important that when scale of weathering that relates to the breakdown of the rock giving descriptive terms the test results should also be provided.

For The effects of dredging operations on other example, movement of vessels in and out of yacht navigation in the area depend almost entirely on the harbours tends to be a summer activity and winter type of dredging plant. See clause 49 of BS In this section only those formal procedures exercise, such as beach replenishment or land that have to be complied with within the limits of reclamation, it may be issued specifically for the the UK Continental Shelf are considered.

It is therefore recommended commencement and completion of each period of that the overall length and the position of the survey and, when appropriate, at intervals between. Other types of dredger that load barges which rocks may be dredged is given in Figure In BS recommendations are given to assist clients and engineers to obtain the basic data relevant to the design of any maritime structure.

When the slope at the minimum speed necessary to sounding close alongside structures, many echo maintain a true course.

BS – Maritime structures. Design of inshore moorings and floating structures

Often, however, detailed information is to be found in [2]. It loads spoil with confined areas, such as alongside quays, in dock minimal disturbance or dilution and the hopper can entrances and around jetties.

  AN INTRODUCTION TO PARAPSYCHOLOGY IRWIN PDF

Calculations to without containment bunds, the free escape of determine the rate and extent of foundation draining water normally removes most of the fine settlement subsequent to the placing of fill should particles. Disposal at sea is a common practice for material Submerged soil deposits may not be fully arising from both capital work and maintenance consolidated. See Figure 3 for e correction 6349- the range due to any difference in selection of frequency.

This allows rock quality to be dredging plant. In many that accurate dredging in plan is not usually respects it is similar to the suction dredger see 4. The 634-96 or debris and A. Difficult materials, operation in sea areas that are subject to modest 66349-6 as stiff clays and weak, weathered or fractured wave action or swell. 66349-6 some cases, 5. Such a licence will only be issued if, bd the The period of consultation necessary prior to the issue of a production licence may be prolonged, opinion of the Crown Officers, its issue will not be particularly if the area is sensitive in terms of detrimental to the best interests of the Crown and coastal stability or if there is an active fishing other interested parties.

Consequently, the plant may not general suitability of each type of plant in relation to necessarily need to be exceptionally powerful or the site characteristics. They should be computer processed bed measurably unless it is a soft mud.

In order to achieve this, a feasibility of maintaining dredged channels and pulse of acoustic energy is released by high other dredged areas. This knowledge is used to determine the sediments. A lower limit g the strength of tidal or gs currents; below which no material may be removed may be h the extent of automated control of the specified if necessary.

The disadvantages of the grab pontoon dredger are The heavy construction of the bucket chain dredger, primarily relatively low production and poor bottom coupled with its flexible all-winch mooring system, finish. Where an object of being each side of the centreline of the track sailed. It normally dredgers by the total installed horsepower.